← Google Interview Insights

Google·Software Engineer·Technical Phone Screen·Intermediate

IntermediatePrefer not to say
May 2026

Summary

Google SWE coding round with a scheduling problem that looked like a meeting rooms variant but had a twist that took me a minute to fully parse.

Questions Asked (1)

Q1

Given a list of jobs with start and end times running on a server that handles one job at a time, where overlapping jobs can be merged and jobs that run past the day's end get truncated and resumed next cycle, write a function to determine if the server can complete all jobs each day.

Algorithms & Data StructuresTechnical Trade-offs
Author's notes

My first instinct was classic interval merging, which got me partway there.

Create a free account to read the full note

AI HintsAI Generated

Suggested Approach

First, clarify the problem constraints and edge cases, such as whether jobs are given in sorted order and how truncation and resumption affect scheduling. Then, model the problem as merging overlapping intervals and checking if the total merged duration per day exceeds the available time, considering carry-over from previous days. Finally, design an algorithm that efficiently simulates the server's daily processing, possibly using a sweep line or interval merging approach.

Pro tip: Demonstrate awareness of real-world scheduling by discussing how to handle jobs that span multiple days and the importance of choosing data structures that allow efficient merging and querying. Also, mention that you would validate your solution with edge cases like zero-duration jobs or jobs exactly at day boundaries.

1. Clarify requirements and constraints

Ask questions to understand the input format, job ordering, definition of a day, and whether jobs can be split or must run contiguously. Confirm if the server can process jobs in any order or must follow a specific sequence.

2. Model the problem

Represent jobs as intervals and define the daily capacity. Consider how overlapping jobs merge and how truncation at day's end creates a remaining portion to be scheduled next day.

3. Design an algorithm

Choose an approach: either simulate day by day, merging intervals and tracking carry-over, or use a sweep line to compute total busy time per day. Ensure the algorithm handles jobs that span multiple days.

4. Analyze complexity and trade-offs

Discuss time and space complexity of your approach. Compare alternatives like sorting-based merging versus priority queues, and justify your choice based on expected input size and constraints.

5. Test with edge cases

Walk through examples including no jobs, jobs exactly filling a day, jobs that overlap and truncate, and jobs that resume across multiple days. Verify correctness and efficiency.

Key Points to Mention

  • Interval merging to combine overlapping jobs and compute total busy time.
  • Handling truncation at day boundaries and carrying over remaining job time to the next day.
  • Daily capacity check: total merged duration per day must not exceed available time.
  • Data structures: sorting for merging, or priority queues for dynamic scheduling.
  • Time and space complexity analysis, aiming for O(n log n) due to sorting.
  • Edge cases: zero-duration jobs, jobs spanning multiple days, and jobs exactly at boundaries.

AI-generated suggestions, not part of the candidate's original notes. May be inaccurate — verify before relying on them.