← DoorDash Interview Insights

DoorDash·Software Engineer·Technical Phone Screen·Intermediate

Intermediate
Jun 2026

Summary

DoorDash SWE phone screen focused on a pay calculation problem built around a sequence of delivery events. The interviewer skipped the basic part and went straight to a trickier interval-splitting variant. Pretty domain-specific but not unreasonable once you understood the schema.

Questions Asked (1)

Q1

Given a chronologically ordered list of delivery events for a single driver's day (each with a start time, end time, and type), compute the corrected total daily pay where any active delivery interval that overlaps a peak-hour window gets 2x pay for the overlapping portion. How do you split intervals at peak boundaries and handle edge cases like multiple peak windows or gaps?

Algorithms & Data StructuresTechnical Trade-offs
Author's notes

The schema clarification part took longer than I expected.

Create a free account to read the full note

AI HintsAI Generated

Suggested Approach

First, clarify the problem constraints and assumptions (e.g., event types, peak windows, pay rates). Then, outline a sweep-line algorithm that processes all interval endpoints (delivery starts/ends and peak starts/ends) in sorted order, splitting intervals at peak boundaries and accumulating pay with the appropriate multiplier. Finally, discuss edge cases and complexity.

Pro tip: Mention that you would confirm whether peak windows can overlap and how to handle them (e.g., merge or apply max multiplier) before coding, as this ambiguity often trips up candidates.

1. Clarify requirements and assumptions

Ask about event types (only deliveries?), peak window definitions (fixed daily windows?), pay structure (base rate per hour?), and whether peak windows can overlap. Confirm that intervals are half-open [start, end) to avoid double-counting at boundaries.

2. Choose an algorithm

Use a sweep-line approach: collect all critical time points (delivery starts/ends, peak starts/ends), sort them, and iterate through consecutive segments. For each segment, determine if it's within any peak window and apply the correct pay multiplier.

3. Handle interval splitting and pay calculation

For each delivery interval, split it at peak boundaries. For each sub-interval, compute duration and multiply by the base rate, applying 2x if the sub-interval falls within a peak window. Sum all sub-interval pays.

4. Address edge cases

Consider: deliveries that start/end exactly at peak boundaries, zero-duration intervals, multiple peak windows, overlapping peak windows (merge or take max multiplier), and gaps between deliveries (no pay).

5. Analyze complexity and optimize

Sorting endpoints takes O(n log n) where n is total number of events and peak boundaries. Sweeping takes O(n). Discuss potential optimizations like merging overlapping peaks first or using a priority queue for dynamic peak windows.

Key Points to Mention

  • Sweep-line algorithm to process events in chronological order
  • Splitting intervals at peak boundaries to correctly apply 2x pay
  • Handling overlapping peak windows (merge or take maximum multiplier)
  • Using half-open intervals [start, end) to avoid double-counting at boundaries
  • Time complexity: O(n log n) due to sorting, O(n) for sweep
  • Edge cases: zero-duration intervals, deliveries spanning multiple peaks, gaps between deliveries

AI-generated suggestions, not part of the candidate's original notes. May be inaccurate — verify before relying on them.