← Meta Interview Insights

Meta·Software Engineer·Technical Phone Screen·Intermediate

IntermediatePrefer not to say
Jun 2026

Summary

Meta software engineer interview with two design-focused coding questions. Both leaned on data structure fundamentals, prefix sums and stack design, nothing flashy but you had to actually know your stuff.

Questions Asked (2)

Q1

Design a class that supports efficient range sum queries on an immutable integer array, where the query function can be called many times.

Algorithms & Data StructuresSystem Design
Author's notes

Prefix sum is pretty textbook but the part that tripped me up was thinking about initialization cost vs query cost.

Create a free account to read the full note

AI HintsAI Generated

Suggested Approach

Start by clarifying the requirements: the array is immutable, and the query function will be called many times, so preprocessing is worthwhile. Propose a prefix sum array that allows O(1) query time after O(n) preprocessing, and discuss the trade-off of using extra space. Then implement the class with a constructor that builds the prefix sum and a method that returns the sum of a range in constant time.

Pro tip: Mention that you would handle edge cases like empty array, invalid ranges, and integer overflow, and that you would consider using a 64-bit integer for the prefix sums to avoid overflow. Also, briefly note that if updates were allowed, a Fenwick tree or segment tree would be needed, showing awareness of alternatives.

1. Clarify requirements and constraints

Confirm that the array is immutable, queries are frequent, and determine the expected range of values and query indices. Ask about memory constraints and whether the array can be empty.

2. Choose the right data structure

Select a prefix sum array (cumulative sum) because it provides O(1) query time after O(n) preprocessing, which is optimal for frequent queries on immutable data.

3. Design the class interface

Define a constructor that takes the integer array and builds the prefix sum, and a method sumRange(i, j) that returns the sum of elements from index i to j inclusive.

4. Implement the prefix sum logic

Build an array where prefix[k] = sum of first k elements (prefix[0] = 0). Then sumRange(i, j) = prefix[j+1] - prefix[i]. Handle edge cases like i > j or out-of-bounds indices.

5. Analyze complexity and discuss trade-offs

State that preprocessing takes O(n) time and O(n) space, and each query takes O(1) time. Mention that this is optimal for immutable arrays and compare with alternatives like segment trees for mutable arrays.

Key Points to Mention

  • Prefix sum array construction and its O(n) preprocessing time and space.
  • O(1) query time for range sum queries.
  • Handling edge cases: empty array, invalid range (i > j), out-of-bounds indices.
  • Using 64-bit integers to prevent overflow when summing large arrays.
  • Trade-off: extra O(n) space for faster queries.
  • Alternative data structures (Fenwick tree, segment tree) if updates were allowed.

AI-generated suggestions, not part of the candidate's original notes. May be inaccurate — verify before relying on them.

Q2

Design a max stack that supports push, pop, top, and also peekMax and popMax operations in addition to standard stack behavior.

Algorithms & Data StructuresTechnical Trade-offs
Author's notes

This one is nastier than it looks.

Create a free account to read the full note

AI HintsAI Generated

Suggested Approach

Start by clarifying the requirements and constraints, then propose a solution using two stacks: one for the main stack and one for tracking the maximum values. Discuss the trade-offs between time complexity for popMax and space complexity, and consider optimizations like using a doubly linked list with a tree map for O(log n) operations.

Pro tip: Demonstrate awareness of real-world constraints by discussing how to handle duplicate maximum values and the impact of frequent popMax calls on performance. Mention that in an interview, it's often better to start with a simple solution and then optimize based on feedback.

1. Clarify Requirements

Ask about expected time complexity, frequency of operations, and whether the stack can contain duplicates. Confirm that popMax should remove the topmost maximum element if there are multiple.

2. Propose a Basic Solution

Suggest using two stacks: one for all elements and one for tracking maximums. Explain how push, pop, top, and peekMax work in O(1) time, but popMax requires O(n) time to remove the maximum.

3. Analyze Trade-offs

Compare the two-stack approach with more advanced solutions like a doubly linked list combined with a balanced BST (e.g., TreeMap) to achieve O(log n) for all operations. Discuss space and implementation complexity.

4. Optimize for popMax

If needed, describe how to implement O(log n) popMax using a TreeMap mapping values to lists of nodes, and a doubly linked list to maintain stack order. Explain how to update the TreeMap on push and pop.

5. Test with Examples

Walk through a sequence of operations, including duplicates and popMax, to verify correctness. Mention edge cases like popping from an empty stack.

Key Points to Mention

  • Time complexity analysis for each operation in different approaches
  • Handling duplicate maximum values correctly in popMax
  • Space complexity trade-offs between simple and optimized solutions
  • Use of auxiliary data structures like stacks, linked lists, and balanced trees
  • Edge cases: empty stack, single element, all elements equal
  • Real-world considerations: thread safety, memory usage, and API design

AI-generated suggestions, not part of the candidate's original notes. May be inaccurate — verify before relying on them.