This is the classic skyline problem but they pushed way further than I expected.
Start by clarifying the problem and constraints, then propose a sweep line algorithm with a max-heap to track active building heights in O(n log n) time. Explain the event processing order (entering before leaving, taller entering first, shorter leaving first) and how to generate critical points by comparing the current max height to the previous. Finally, discuss correctness, complexity, and edge cases.
Pro tip: Mention that you can avoid heap deletion by using lazy removal: when processing a leaving edge, mark the height as inactive and pop from the heap until the top is active. This keeps the heap operations O(log n) and simplifies the code.
Restate the problem, confirm input format, and define critical points. Ask about tie-breaking rules if not specified.
Propose a sweep line with a max-heap (or divide-and-conquer) and justify O(n log n) time. Explain why a naive approach is inefficient.
Describe how to create events (x, type, height) and sort them with the specified tie-breaking order. Explain how to update the heap and track the current max height.
Explain how to output critical points: after each event, if the max height changes, add the point (x, new height). Ensure no consecutive points have the same height and the last point is (max_x, 0).
Discuss correctness (invariant: heap contains active heights), complexity (O(n log n) time, O(n) space), and edge cases (identical buildings, nested intervals, shared borders, large coordinates).
AI-generated suggestions, not part of the candidate's original notes. May be inaccurate — verify before relying on them.