Amazon SWE online assessment with a scheduling/optimization problem. Nothing behavioral, just code. The problem looks deceptively simple but the constraint about start-time ordering trips you up if you're not careful.

Questions Asked (1)

Q1

Given an array where each element represents the unload time (in minutes) for a truck, and a maximum allowed total turnaround time, find the minimum number of dock bays needed so all trucks are unloaded within that time limit. Trucks must start unloading in order, and a bay can immediately take the next truck once it finishes.

Algorithms & Data Structures
Author's notes

My first instinct was greedy, assign each truck to whichever bay finishes earliest.

Create a free account to read the full note

AI HintsAI Generated

Suggested Approach

This is a scheduling problem where we need to assign trucks to bays in order, minimizing the number of bays such that the total time (makespan) does not exceed the limit. The optimal strategy is to use a greedy algorithm with a min-heap to track the earliest available time of each bay: for each truck, if the earliest available bay can start immediately (i.e., its available time + truck time ≤ limit), assign it there; otherwise, open a new bay. This minimizes the number of bays because we always reuse the bay that becomes free earliest, which is optimal for minimizing the maximum completion time.

Pro tip: Clarify that the greedy approach is optimal by relating it to the classic 'minimum number of machines to schedule jobs by a deadline' problem, and mention that a binary search on the number of bays could also work but is less efficient. Also, handle edge cases like a single truck exceeding the limit by returning -1 or indicating impossibility.

1. Understand the problem and constraints

Restate the problem: trucks must be unloaded in order, each bay processes one truck at a time, and we need the minimum number of bays so that every truck finishes within the given total turnaround time. Clarify that the total turnaround time is the maximum completion time across all trucks.

2. Choose the right data structure and algorithm

Use a min-heap to track the earliest available time of each bay. For each truck, if the earliest available bay can start immediately and finish within the limit, assign it there and update the bay's available time; otherwise, open a new bay. This greedy strategy minimizes the number of bays.

3. Walk through an example

Demonstrate with a small example, such as unload times [10, 20, 30] and limit 40. Show how the heap evolves and how bays are assigned, ensuring the candidate can explain the process clearly.

4. Analyze time and space complexity

Explain that each truck is processed once, and heap operations take O(log k) time where k is the number of bays, leading to O(n log k) time and O(k) space. Mention that k ≤ n, so worst-case O(n log n).

5. Discuss edge cases and alternatives

Address cases like a single truck exceeding the limit (return -1), all trucks fitting in one bay, or many trucks requiring many bays. Optionally, mention that binary search on the number of bays with a feasibility check is another approach but may be less efficient.

Key Points to Mention

  • Greedy algorithm with a min-heap to track bay availability
  • Optimality of the greedy choice: always assign to the bay that becomes free earliest
  • Time complexity: O(n log k) where k is the number of bays, space O(k)
  • Handling of edge cases: truck time exceeding limit, empty array, single truck
  • Alternative approach: binary search on number of bays with simulation
  • Connection to classic scheduling problems like minimizing makespan on identical machines