I knew weighted job scheduling but blanked on how to reconstruct the actual job indices, not just the max value.
Start by clarifying the problem and constraints, then propose a dynamic programming solution that sorts jobs by end time and uses binary search to find the latest non-overlapping job. Explain how to reconstruct the selected jobs by storing predecessor indices, and analyze time and space complexity to confirm O(n log n) time.
Pro tip: Emphasize that sorting by end time is crucial for the DP recurrence to work correctly, and proactively discuss how to handle edge cases like zero-length jobs or identical timestamps to show thoroughness.
Ask about input size, whether jobs can have zero duration, if timestamps are integers or floats, and whether any valid set is acceptable. Confirm that jobs are non-overlapping if one ends before the other starts.
Sort the jobs in ascending order of end time. This ordering ensures that when considering job i, all compatible jobs have indices less than i, enabling a clean DP recurrence.
Let dp[i] be the maximum reward using jobs up to index i. For each job i, find the latest job j < i that does not overlap (end time ≤ start time of i) using binary search. Then dp[i] = max(dp[i-1], reward[i] + dp[j]).
Maintain a parent array to record whether job i was included. After computing dp, backtrack from the last index to collect the indices of chosen jobs.
State that sorting takes O(n log n), binary search for each job takes O(log n), and DP takes O(n), so overall O(n log n) time and O(n) space. Discuss handling zero-length jobs (treat as non-overlapping if end ≤ start) and identical timestamps (stable sort or tie-breaking).
AI-generated suggestions, not part of the candidate's original notes. May be inaccurate — verify before relying on them.