← Roblox Interview Insights

Roblox·Data Scientist·Technical Phone Screen·Senior

SeniorPrefer not to say
Apr 2026Remote

Summary

Roblox data scientist interview that went deep into scheduling theory, which I was not expecting at all. The problem felt more like an operations research PhD qualifying exam than anything I'd call a typical DS interview.

Questions Asked (3)

Q1

You have two parallel assembly stations with sequence-dependent setup times, a precedence constraint between two jobs, and a planned downtime window on one station. How would you argue that this scheduling problem is NP-hard?

Algorithms & Data StructuresTechnical Trade-offs
Author's notes

I knew the general argument, something about reducing from 3-partition or relating it to flow-shop with SDST, but I fumbled trying to be precise about which known hard variant this maps to.

Create a free account to read the full note

AI HintsAI Generated

Suggested Approach

Start by identifying a known NP-hard problem that can be reduced to this scheduling problem, such as the Traveling Salesman Problem or Job Shop Scheduling. Then, show how the specific features—parallel stations, sequence-dependent setups, precedence constraints, and downtime—can be used to encode the known problem. Conclude that since the known problem is NP-hard, this problem is also NP-hard.

Pro tip: When arguing NP-hardness, focus on the reduction from a known NP-hard problem rather than trying to prove it from scratch. Also, mention that even without downtime, the problem is NP-hard, so adding downtime only reinforces it.

1. Identify a known NP-hard problem

Choose a well-known NP-hard problem that closely resembles the scheduling problem, such as the Traveling Salesman Problem (TSP) or the Job Shop Scheduling Problem (JSSP).

2. Establish the reduction

Describe how to transform any instance of the known NP-hard problem into an instance of the given scheduling problem in polynomial time, using the features like parallel stations, sequence-dependent setups, precedence constraints, and downtime.

3. Show equivalence of solutions

Argue that a solution to the scheduling instance corresponds to a solution of the known NP-hard instance, and vice versa, ensuring the reduction is valid.

4. Conclude NP-hardness

Since the known problem is NP-hard and the reduction is polynomial, the scheduling problem is NP-hard.

Key Points to Mention

  • NP-hardness definition and reduction concept
  • Traveling Salesman Problem (TSP) or Job Shop Scheduling Problem (JSSP) as a starting point
  • Sequence-dependent setup times can encode distances or transition costs
  • Precedence constraints can enforce ordering as in TSP or JSSP
  • Planned downtime adds complexity but is not necessary for NP-hardness
  • Polynomial-time reduction and its implications

AI-generated suggestions, not part of the candidate's original notes. May be inaccurate — verify before relying on them.

Q2

Given the specific instance with three jobs, two stations, known processing and setup times, a precedence constraint that J2 cannot start before J1 finishes, and a maintenance window on S1 from t=60 to t=70, compute the optimal schedule with explicit start and finish times per station and the final makespan.

Algorithms & Data StructuresSystem Design
Author's notes

This was the part that actually broke me a little.

Create a free account to read the full note

AI HintsAI Generated

Suggested Approach

Model the problem as a two-machine flow shop with precedence constraints and a maintenance window, then use a Gantt chart or scheduling algorithm to find the optimal sequence. Compute start and finish times for each job on each station, ensuring the maintenance window is respected and precedence is satisfied, and finally determine the makespan.

Pro tip: Clearly state your assumptions about setup times (e.g., whether they are sequence-dependent or included in processing times) and whether preemption is allowed, as these details significantly affect the solution.

1. Understand the problem and constraints

Identify all given parameters: processing times, setup times, precedence constraint (J2 after J1), and maintenance window on S1 (60-70). Clarify if setup times are sequence-dependent and if jobs can be preempted.

2. Choose a scheduling approach

Since it's a small instance (3 jobs, 2 stations), use a Gantt chart or enumerate possible sequences. For larger instances, consider Johnson's rule for flow shop, but adapt for maintenance and precedence.

3. Construct the schedule

Assign start and finish times for each job on each station, ensuring that S1 is not used during maintenance, and that J2 starts after J1 finishes on both stations (or as specified).

4. Validate and compute makespan

Check that all constraints are satisfied, then compute the makespan as the maximum finish time across all jobs on the last station.

Key Points to Mention

  • Precedence constraint: J2 cannot start before J1 finishes (on which station? clarify if it's on S1, S2, or both).
  • Maintenance window: S1 unavailable from t=60 to t=70, so schedule must avoid that interval.
  • Setup times: whether they are sequence-dependent and how they affect job sequencing.
  • Flow shop scheduling: two stations in series, each job must be processed on S1 then S2.
  • Makespan calculation: the completion time of the last job on S2.
  • Assumptions: no preemption, jobs are independent except for precedence, and setup times are known.

AI-generated suggestions, not part of the candidate's original notes. May be inaccurate — verify before relying on them.

Q3

For the general version of this problem with n jobs and m stations, propose a practical solver. You can use an integer program, a metaheuristic, or both. Discuss complexity, any pruning strategies, and what approximation guarantees or bounds you can claim.

System DesignTechnical Trade-offsAlgorithms & Data Structures
Author's notes

Felt more comfortable here.

Create a free account to read the full note

AI HintsAI Generated

Suggested Approach

Start by formally defining the problem as a scheduling or assignment optimization, then propose a hybrid solver that uses an integer program for small instances and a metaheuristic (e.g., genetic algorithm or simulated annealing) for large instances. Discuss complexity, pruning techniques like dominance rules or lower bounds, and provide approximation guarantees or bounds based on LP relaxation or problem-specific properties.

Pro tip: At Roblox, emphasize scalability and practical deployment: mention how you'd validate the solver with real data, monitor performance, and fall back to heuristics under time constraints. Also, relate the problem to resource allocation in cloud gaming or content moderation pipelines to show domain awareness.

1. Problem Formalization

Clearly define the decision variables, objective function, and constraints for the general n jobs and m stations problem. Identify if it's a known NP-hard problem (e.g., job shop scheduling) to set expectations.

2. Solver Design

Propose a hybrid approach: use an integer program (e.g., MILP) for exact solutions on small instances, and a metaheuristic (e.g., genetic algorithm, tabu search) for large instances. Explain how to integrate them, such as using the IP to seed the metaheuristic or to provide bounds.

3. Complexity and Pruning

Analyze the computational complexity (likely NP-hard) and discuss pruning strategies like branch-and-bound with lower bounds, constraint propagation, or dominance rules to reduce the search space.

4. Guarantees and Bounds

State any approximation guarantees (e.g., constant-factor approximations for special cases) or bounds from LP relaxation, and discuss how to compute valid lower bounds to assess solution quality.

5. Practical Considerations

Address implementation details: scalability, parallelization, time limits, and how to handle dynamic changes. Mention evaluation metrics and potential trade-offs between solution quality and runtime.

Key Points to Mention

  • NP-hardness of general scheduling problems and implications for solver choice
  • Integer programming formulation with variables, constraints, and objective
  • Metaheuristic choices (e.g., genetic algorithms, simulated annealing) and their parameters
  • Pruning techniques such as branch-and-bound, constraint propagation, and dominance rules
  • Approximation guarantees or bounds from LP relaxation or problem-specific analysis
  • Scalability and practical deployment considerations for large-scale systems