The sneaky part isn't the pipeline debugging, it's the survey deadline buried in there.
Prioritize actions by impact and reversibility: first secure the mandatory survey, then triage the hidden test failure with a time-boxed, low-risk fix, and avoid unverified changes that could break visible tests. Communicate your reasoning clearly, showing you weigh deadlines, correctness, and collaboration.
Pro tip: Mention that you would time-box any fix attempt and keep a rollback plan, because in a timed OA, preserving a working solution often beats chasing a perfect one. Also note that the survey is non-negotiable—missing it could invalidate your entire submission.
Identify hard deadlines (survey, OA submission) and the cost of failure for each. The survey is mandatory and likely quick, so it should be secured first to avoid disqualification.
Determine if the failure is due to a clear bug (e.g., edge case) or ambiguous. Check if the teammate's fix is plausible and low-risk, but do not apply unverified changes blindly.
If attempting a fix, set a strict time limit (e.g., 10 minutes) and run visible tests plus any quick sanity checks. Keep a backup of the working version to revert if needed.
If the fix is risky or time runs out, submit the working solution and note the known issue. Thank the teammate but explain why you can't use an unverified fix under time pressure.
Ensure the mandatory survey is submitted before the deadline, even if it means submitting the OA with the current solution. The survey is a hard requirement.
AI-generated suggestions, not part of the candidate's original notes. May be inaccurate — verify before relying on them.