← Google Interview Insights

Google·Software Engineer·Technical Phone Screen·Intermediate

Intermediate
Jun 2026

Summary

Google SWE interview with a scheduling/greedy problem. Pretty classic interval scheduling but the minimization angle tripped me up more than I expected.

Questions Asked (1)

Q1

Given a list of car rental requests each with a start and end time, assign cars to rentals such that the total number of cars used is minimized.

Algorithms & Data Structures
Author's notes

My first instinct was to sort by start time and just greedily assign an available car if one exists, otherwise spin up a new one.

Create a free account to read the full note

AI HintsAI Generated

Suggested Approach

Model each rental as an interval and recognize that the minimum number of cars equals the maximum number of overlapping intervals at any point in time. Sort all start and end times, then sweep through them to count concurrent rentals, updating the maximum. This yields an O(n log n) solution.

Pro tip: Clarify upfront whether a rental ending at time t and another starting at t can share the same car; if so, process end times before start times when sweeping to avoid overcounting. Also mention that if actual assignments are needed, a min-heap of car availability times can produce them.

1. Clarify requirements and edge cases

Ask whether intervals are half-open (end == start allowed) and whether actual car assignments are needed or just the count. Confirm input format and constraints.

2. Reduce to maximum overlap

Explain that minimizing cars is equivalent to finding the maximum number of rentals active at any moment, since each concurrent rental needs a distinct car.

3. Design the sweep-line algorithm

Create events for each start (+1) and end (-1), sort them by time with ends before starts at equal times, then sweep to track current active rentals and the maximum.

4. Analyze complexity and discuss assignment

State O(n log n) time and O(n) space. If assignments are required, describe using a min-heap of car end times to reuse cars efficiently.

5. Test with examples

Walk through a small example (e.g., intervals [1,4], [2,5], [3,6]) to verify the count and assignment logic, including boundary cases.

Key Points to Mention

  • Interval scheduling / sweep line technique
  • Maximum overlap equals minimum number of resources
  • Sorting events with tie-breaking (end before start if intervals are half-open)
  • Time complexity O(n log n), space O(n)
  • Using a min-heap for actual car assignment
  • Handling edge cases like zero-length intervals or no rentals

AI-generated suggestions, not part of the candidate's original notes. May be inaccurate — verify before relying on them.