← Google Interview Insights

Google·Software Engineer·Onsite - System Design / Architecture·Senior

Senior
Apr 2026

Summary

Solutions architect screen at Google centered on a single infrastructure scenario about a booking platform with traffic-driven downtime. Pretty focused, no fluff.

Questions Asked (1)

Q1

A booking platform sees heavy daytime traffic and needs server upgrades to handle it, but those upgrades cause 10 to 30 minutes of downtime. How would you redesign this to eliminate or minimize that downtime?

System DesignTechnical Trade-offsAdaptability & Ambiguity
Author's notes

My first instinct was blue-green deployments and I jumped to that pretty fast, maybe too fast.

Create a free account to read the full note

AI HintsAI Generated

Suggested Approach

Start by clarifying the constraints and requirements, then propose a multi-layered strategy that combines architectural changes (like horizontal scaling and load balancing) with deployment techniques (like rolling updates and blue-green deployments) to achieve zero-downtime upgrades. Emphasize incremental improvements and trade-offs between complexity, cost, and downtime reduction.

Pro tip: Always tie your solution back to the business impact—quantify the cost of downtime and show how your approach balances reliability with engineering effort. Google values pragmatic innovation, so highlight how you'd measure success and iterate.

1. Clarify Requirements and Constraints

Ask questions to understand the current architecture, traffic patterns, downtime tolerance, and budget. This ensures your solution is tailored and addresses the interviewer's implicit needs.

2. Identify Downtime Sources

Break down where downtime occurs during upgrades: server restarts, database migrations, configuration changes, etc. This helps prioritize which areas to tackle first.

3. Propose Architectural Changes

Suggest horizontal scaling with load balancers, stateless services, and database replication to allow gradual traffic shifting. Consider microservices to isolate upgrades.

4. Implement Deployment Strategies

Detail techniques like rolling updates, blue-green deployments, and canary releases to minimize or eliminate downtime. Explain how they work and their trade-offs.

5. Address Data and State Management

Discuss handling database schema changes, session state, and data consistency during upgrades. Mention tools like feature flags and backward-compatible migrations.

Key Points to Mention

  • Horizontal scaling and load balancing to distribute traffic and enable gradual rollout
  • Blue-green deployment: maintain two identical environments and switch traffic atomically
  • Rolling updates: upgrade servers in batches while others continue serving traffic
  • Canary releases: test new version with a small subset of users before full rollout
  • Database migration strategies: use online schema changes, replication, and backward-compatible changes
  • Feature flags and configuration management to decouple deployment from release

AI-generated suggestions, not part of the candidate's original notes. May be inaccurate — verify before relying on them.