← Openai Interview Insights

Openai·Software Engineer·Onsite - System Design / Architecture·Senior

Senior
May 2026

Summary

System design round at OpenAI for a software engineer role. The core problem was around shard rebalancing across overlapping ranges, which sounds manageable until you're twenty minutes in and questioning every data structure you've ever learned.

Questions Asked (1)

Q1

Given a collection of ranges each with a start and end, design an algorithm to assign or rebalance shards across those ranges so that the number of overlapping assignments within any single range stays within a given limit. Walk through your data structures, handle edge cases like fully nested ranges and identical endpoints, and analyze time and space complexity.

Algorithms & Data StructuresSystem DesignTechnical Trade-offs
Author's notes

I went straight to a sweep-line approach and started talking through a sorted event list, open events, active shard counts.

Create a free account to read the full note

AI HintsAI Generated

Suggested Approach

Clarify the problem by defining what 'overlapping assignments' means and the constraints, then propose a sweep-line algorithm with a priority queue to track active ranges and assign shards greedily, ensuring the limit is not exceeded. Discuss how to handle nested ranges and identical endpoints by sorting events carefully and using tie-breaking rules.

Pro tip: Mention that the greedy approach is optimal for minimizing the maximum overlap if we assign shards to the range with the earliest end time first, similar to interval scheduling. Also, highlight that using a balanced BST or segment tree can efficiently query and update overlaps.

1. Clarify requirements and constraints

Ask questions to understand the exact meaning of 'overlapping assignments', the limit, and whether shards can be reassigned. Confirm if ranges are inclusive/exclusive and if endpoints can be identical.

2. Choose data structures and algorithm

Propose a sweep-line algorithm: sort all start and end events, use a priority queue (min-heap) to track active ranges by end time, and a counter for current assignments. For each start event, assign a shard if under limit, else rebalance by moving a shard from the range with the latest end time.

3. Handle edge cases

Address fully nested ranges by ensuring the sweep processes starts before ends at the same point, and identical endpoints by using stable sorting or tie-breaking. Discuss how to handle ranges with zero length or when limit is zero.

4. Analyze complexity

State that sorting takes O(n log n) time, and each event is processed in O(log n) with heap operations, leading to O(n log n) overall time. Space complexity is O(n) for storing events and active ranges.

5. Discuss trade-offs and optimizations

Compare with alternative approaches like segment trees or interval graphs, and discuss trade-offs between time and space, and whether the greedy assignment is optimal for minimizing maximum overlap.

Key Points to Mention

  • Sweep-line algorithm with event sorting and priority queue
  • Greedy assignment strategy: assign to range with earliest end time to minimize future conflicts
  • Handling nested ranges and identical endpoints via event ordering and tie-breaking
  • Time complexity O(n log n) and space complexity O(n)
  • Potential use of segment trees or balanced BSTs for dynamic overlap queries
  • Optimality of greedy approach for interval scheduling problems

AI-generated suggestions, not part of the candidate's original notes. May be inaccurate — verify before relying on them.