← Bytedance Interview Insights

Bytedance·Software Engineer·Technical Phone Screen·Intermediate

IntermediatePass
Jun 2026Remote

Summary

Did a technical phone screen for a software engineer role at Bytedance. The coding problems weren't too bad but the 2D follow-up added a bit of pressure. Heard back about four days later that I passed.

Questions Asked (2)

Q1

Find the longest subarray consisting of consecutive 1s in a 1D array.

Algorithms & Data Structures
Author's notes

Sliding window, pretty much immediately.

Create a free account to read the full note

AI HintsAI Generated

Suggested Approach

Clarify the problem definition (e.g., array elements are 0/1, subarray is contiguous, return length or indices). Then propose a single-pass O(n) solution that tracks the current run of 1s and the maximum seen so far. Walk through a small example to demonstrate correctness and discuss edge cases.

Pro tip: Mention that this is a classic streaming/online algorithm that uses O(1) extra space, and if asked to return the actual subarray, you can store the start index when a new max is found. This shows you think about practical extensions and memory constraints.

1. Clarify requirements and constraints

Ask whether the array contains only 0s and 1s, whether the subarray must be contiguous, and what to return (length, start/end indices, or the subarray itself). Also confirm input size and any memory constraints.

2. Outline the optimal approach

Explain that a single pass suffices: maintain a running count of consecutive 1s and update the maximum whenever the count exceeds it. Reset the count to 0 when a 0 is encountered.

3. Walk through an example

Trace the algorithm on a small array like [1,1,0,1,1,1] to show how the count and max evolve, and verify the result (length 3).

4. Analyze complexity and edge cases

State time complexity O(n) and space O(1). Discuss edge cases: all 1s, all 0s, empty array, and single-element array.

5. Discuss extensions and trade-offs

If asked, explain how to return the subarray indices by tracking the start of the current run, and note that this approach works for streaming data.

Key Points to Mention

  • Single-pass O(n) time and O(1) space solution
  • Maintain current run length and global maximum
  • Reset current run when encountering a 0
  • Handle edge cases: empty array, all 1s, all 0s
  • Optionally track start index to return the subarray
  • Clarify input assumptions (binary array, contiguous subarray)

AI-generated suggestions, not part of the candidate's original notes. May be inaccurate — verify before relying on them.

Q2

Extend the previous problem to a 2D array: find the largest subregion of consecutive 1s.

Algorithms & Data Structures
Author's notes

This is where I slowed down.

Create a free account to read the full note

AI HintsAI Generated

Suggested Approach

Clarify the definition of 'subregion' (e.g., rectangular vs. arbitrary shape) and whether 'consecutive 1s' means connected via 4-directional adjacency. Then propose an efficient algorithm such as dynamic programming for maximal rectangle or BFS/DFS for largest connected component, analyzing time and space complexity.

Pro tip: Always discuss trade-offs between different interpretations and algorithms, and mention how to handle edge cases like empty input or all zeros. This shows you think like a senior engineer who considers ambiguity and robustness.

1. Clarify the problem

Ask the interviewer to define 'subregion' (rectangle, arbitrary shape, etc.) and 'consecutive' (4-directional or 8-directional connectivity). Confirm whether the subregion must be contiguous and if overlapping is allowed.

2. Discuss brute force and optimal approaches

Mention brute force (check all subregions) and its inefficiency. Then propose optimal solutions: for rectangular subregion, use DP for maximal rectangle; for arbitrary shape, use BFS/DFS to find largest connected component.

3. Outline algorithm steps

For DP: compute heights, then for each row use stack to find largest rectangle. For BFS/DFS: iterate through grid, when encountering unvisited '1', perform BFS/DFS to mark component and track size.

4. Analyze complexity and edge cases

State time and space complexity (e.g., O(mn) for both approaches). Discuss edge cases: empty grid, no 1s, all 1s, and large grids.

5. Code and test

Write clean code with meaningful variable names, and walk through a small example to verify correctness. Mention potential optimizations if needed.

Key Points to Mention

  • Definition of 'subregion': rectangular vs. arbitrary shape
  • Connectivity: 4-directional vs. 8-directional
  • Dynamic programming approach for maximal rectangle (histogram method)
  • BFS/DFS for largest connected component
  • Time and space complexity analysis (O(mn) typical)
  • Edge cases: empty grid, no 1s, all 1s, single row/column

AI-generated suggestions, not part of the candidate's original notes. May be inaccurate — verify before relying on them.